// Your hardware. Our infrastructure.

Rack space.
Room to grow.

Bring your servers to Dhaka and grow from a single rack unit to a private cabinet. Plan power, cooling and connectivity before your equipment arrives.

Plan my rack space ↗
1U TO 42UA / B POWER PLANNING

Choose your footprint.

Shared rack

1U / 2U slots

Start with individual servers. Confirm rails, chassis depth and access for future replacements.

Expanded footprint

4U & larger systems

Allow for storage chassis, equipment weight, airflow and power density.

Private cabinet

Full 42U cabinet

Plan multiple servers and network devices together with cable routing and power distribution.

Custom project

Multiple racks

Share a growth forecast so adjacent space and inter-rack cabling can be assessed.

The rack is only the beginning.

Our infrastructure profile includes N+1 cooling and power arrangements. Confirm the applicable allocation and service commitments.

Planning areaWhat to shareWhat to agree
PowerMeasured draw, PSU count, plug typesCapacity, metering and feeds
CoolingChassis airflow and expected loadRack density and layout
NetworkPorts and traffic requirementsDomestic/global bandwidth and patching
AccessAuthorized staff and maintenance needsVisit procedure and remote-hands scope

From inventory to installation.

  1. 01

    Submit your inventory

    List servers, rails, switches and accessories with rack units and measured power.

  2. 02

    Agree the layout

    Review equipment positions, feeds, ports, labels and delivery arrangements.

  3. 03

    Install & verify

    Confirm placement, access and connectivity before the deployment handover.

// Before you get started

Questions, answered.

The details that matter for datacenter colocation.

Can I start with a single server?

Yes. Discuss a 1U slot or a larger allocation based on chassis dimensions, power draw and cabling. Availability and prices are confirmed by quotation.

What should I confirm about redundant power?

Confirm allocated power, connectors and A/B feed arrangements before delivery. Redundant feeds require compatible equipment; service commitments are agreed in writing.

How do deliveries and visits work?

Arrange authorized access and equipment delivery with the facility team. Provide the inventory, installation instructions and approved contacts. Remote hands can be quoted separately.

// Privacy controls

Necessary storage

Always active

Remembers this privacy choice for up to 180 days. It is not used for tracking.

Analytics & advertising

Not used on this website. There are no tracking categories to enable.

Cookie Policy